Installing a 26-ton escalator in a hard-to-reach location where ground pressures must be kept to a minimum was a challenge that Caden tackled together with De Groote. Caden devised a...
For this project with ArcelorMittal, a gas pipe with a large diameter needed to be relocated. A 34-hour shutdown was planned during which the setup, execution, and dismantling of the...